City Water Treatment

okean su filterleri su təmizləmə akvafor su filterleri aura su filterleri su temizleme sistemi
okean su filterleri su təmizləmə akvafor su filterleri aura su filterleri su temizleme sistemi

Project

Water purification for the city of Agstafa

Customer requirements

Construction of underground tanks (volume 250 m3)

Construction of a building to accommodate filtration equipment (12 mx 25 mx 12 m)

Construction of a pump house (8 mx 8 mx 8 m)

Office building construction (5 mx 10 m)

List of work done

-Construction works

-Work on metal construction

-Electrics

-Fire system

– Lightning conductor

– Installation under beam cranes

-Mechanical works

-Plumbing works

-Finishing works

-Engineering

-Procurement

-Installation of equipment

-Start-up of equipment’s

-Asphalt work

-Restoration work of the territory

-Painting and restoration of existing buildings

-Greening

List of installed equipped for water treatment

1) Mechanical water purification up to 130 microns Amiad SAF 1500 (Israel) – 1 system Productivity

2) Mechanical purification of water up to 25 μR 6 systems Performance

3) Atlantium UV disinfection system (Israel) – 3 system Productivity

4) System for the destruction of salts Scale Blaster (USA) – 3 system Productivity

5) Reverse Osmosis System – 3 System Productivity

Çata başla
Bizə Yazın